If your team manages test cases in Zephyr, you can now connect Zephyr directly to mabl! Use the new Zephyr integration to record test results in Zephyr test cycles and to build new mabl tests from your existing test cases.
Record plan run results in Zephyr test cycles
Link mabl tests to Zephyr test cases in each test's Test cases section, and mabl records plan run results against those cases. Your Zephyr test records stay up to date for reporting, audits, and compliance requirements.
You can sync results in two ways:
- Automatic sync: turn on Automatically sync plan run results in the integration settings, and mabl records each plan run in a Zephyr test cycle when it completes.
- Manual sync: on the plan run output page, click on the Zephyr button and then Sync to Zephyr.
Build new tests from Zephyr test cases
On the Build tests page, click + below the prompt and choose Zephyr test case to hand a test case to the mabl agent. The agent uses the test case's objective, precondition, and steps as the specification for a new test.
If you build a test from a single test case, mabl links the saved test to that case, so future plan runs report results back to it.
Get started
Go to Settings > Integrations and add Zephyr with your Zephyr region, a Zephyr API token, and the keys of the projects whose test cases you want to link. Then choose where mabl records results and which Zephyr statuses to use. The Zephyr integration article has the full walkthrough.